| TESTS | COST (SRs) |
| Sampling and preparation | 210.00 |
| Sieve analysis | 65.00 |
| Crushing strength value | 65.00 |
| Specific gravity | 65.00 |
| Soundness | 65.00 |
| Moisture content | 65.00 |
| Relative density and water absorption | 65.00 |
| Field settling | 65.00 |
| TESTS | COST (SRs) |
| Sampling and preparation | 250.00 |
| Water content | 155.00 |
| Binder content | 170.00 |
| Grading of aggregates | 123.00 |
| Marshall test | 133.00 |
| TESTS | COST (SRs) |
| Setting time | 70.00 |
| Consistency | 70.00 |
| Expansion | 210.00 |
| Strength of cement and sand mix | 150.00 |
| TESTS | COST (SRs) |
| Sampling of fresh concrete | 216.00 |
| Slump test | 65.00 |
| Compacting factor test | 60.00 |
| Compressive strength of concrete cube | 65.00 |
| Schmidt rebound hammer strength test | 223.00 |
| TESTS | COST (SRs) |
| Compressive strength | 60.00 |
| TESTS | COST (SRs) |
| Sampling and preparation | 218.00 |
| Moisture content | 65.00 |
| Silt content | 60.00 |
| Liquid limit | 60.00 |
| Plastic limit | 60.00 |
| Linear shrinkage | 60.00 |
| Particle size distribution (wet seiving) | 60.00 |
| Particle size distribution (dry seiving) | 60.00 |
| TESTS | COST (SRs) |
| Dry density/moisture content relationship (Proctor test) | 220.00 |
| Field density | 250.00 |
| California Bearing Ration (CBR) | 260.00 |
| TESTS | COST (SRs) |
| Moisture content | 65.00 |
| Wood drying services (Cost per plank) | 4.00 |
| Wood drying services (Full month rental of solar kiln) | 1500.00 |